Discover the project video below:

The players

On this project, notable building industry players were involved. Ineo was particularly in charge of the electrical installation and CLAREO lighting while Bouygues Construction supervised the structural work.

Project constraints

For this project, the architect had specified an "Optic" design for the lighting fixtures with specific dimensions of 1250x100 in fineline installation type. The products also needed to be low-consumption, specifically less than 5W/m², to obtain the BREEAM Very Good certification.

Our response

To meet these constraints, we designed a UNIQUE and custom-made luminaire specifically for this project:

  • Mold Creation
  • Color Customization
  • Flow and Consumption Customization
  • WIELAND® Connector