Discover the project video below:

The participants

This project was designed by architect-engineer Marc Mimram for Icade Promotion. EMI Tertiaire, a VINCI group company, was responsible for the electrical installation and CLAREO lighting.

Project constraints

For this project, the main constraint was the need for a custom-made product for integration into a metal tray ceiling with specific dimensions of 1080x250 and 750x250. The building also had to be certified HQE Excellent and BREEAM Excellent.

Our response

To meet these constraints, we designed a UNIQUE and custom-made luminaire specifically for this project:

  • Creation of a mold
  • Color customization
  • Customization of Flow and consumption
  • WIELAND® connectors

In total, CLAREO provided more than 2,000 light points for this project.