To learn more about how the project unfolded, we spoke with Guillaume P., a construction manager at GEREL.
The interview
Could you briefly tell us about the project?
" Located on a narrow cobblestone street near the Pont de Puteaux, the “Le Casino” performance venue was built here in 1865 and converted into a movie theater in the early 20th century. In 2016, the city bought the theater to demolish it and expand the neighboring Parmentier preschool. The demolition announcement sparked an outcry from the opposition, so the city assured residents that the building’s façade would be preserved. Today, Parmentier school has six classrooms, a large cafeteria, a resource center, spaces for its recreational program and a basement for technical facilities. "
What were CLAREO’s strengths during the project?
" I wanted to work with CLAREO again for several reasons. First, the technical support, follow-up and responsiveness of my dedicated sales representative were much appreciated and valuable throughout the project. We also needed a wide variety of products, and CLAREO’s extensive range met our needs, as did the reliability of its products. "
What was the biggest challenge on this project?
" The façade dates from the 1800s, and the mayor required us to preserve and reuse it. To respect the architecture, we had to propose an attractive, discreet lighting system. Because the façade has moldings and decorative details, we also had to analyze it and conduct studies to determine which products could be installed. With support from our sales representative and the DIALux team, we decided to backlight it using an LED strip recessed into an aluminum profile. "
A closer look at the “luminous ceiling”
" By installing 600x600 and 300x300 panels together, we created several luminous ceilings.
CLAREO supplied a mix of 164 ACCESS panels in different sizes to achieve this effect. "